DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

SSH EN 60728-7-3:2005

Cable networks for television signals, sound signals and interactive services - Part 7-3: Hybrid Fibre Coax Outside Plant Status Monitoring - Power supply to Transponder Interface Bus (PSTIB) Specification

Jan 11, 2010
95.99 Withdrawal of Standard   Apr 11, 2013

General information

95.99     Apr 11, 2013

DPS

DPS/KT 9

European Norm

33.040     33.100.20     33.160  

English  

Buying

Withdrawn

Language in which you want to receive the document.

Scope

Specifies requirements for the Hybrid Fibre Coax (HFC) Outside Plant (OSP) Power Supplies (PS). This standard is part of a series developed to support the design and implementation of interoperable management systems for evolving HFC cable networks. The purpose of the standards is to support the design and implementation of interoperable management systems for evolving HFC cable networks. The Power Supply to Transponder Interface Bus (PSTIB) specification describes the physical (PHY) interface and related messaging and protocols implemented at the Data Link Layer (DLL), layers 1 and 2 respectively in the 7-layer ISO-OSI reference model, that support communications between compliant transponders and the managed OSP power supplies and other related power equipment to which they interface.

Life cycle

NOW

WITHDRAWN
SSH EN 60728-7-3:2005
95.99 Withdrawal of Standard
Apr 11, 2013

REVISED BY

PUBLISHED
SSH EN 60728-7-3:2009

Related project

Adopted from EN 60728-7-3:2005