DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

SSH EN 13071-2:2008+A1:2013

Stationary waste containers up to 5 000 l, top lifted and bottom emptied - Part 2: Additional requirements for underground or partly underground systems

Dec 16, 2015
95.99 Withdrawal of Standard   Nov 4, 2020

General information

95.99     Nov 4, 2020

DPS

DPS/KT 230

European Norm

13.030.40  

English  

Buying

Withdrawn

Language in which you want to receive the document.

Scope

This European Standard specifies the additional requirements for underground or partly underground systems top lifted and bottom emptied, used for collection of solid non-hazardous wastes with a capacity up to 5 000 l.

Life cycle

PREVIOUSLY

WITHDRAWN
SSH EN 13071-2:2008/AC:2010

WITHDRAWN
SSH EN 13071-2:2008

NOW

WITHDRAWN
SSH EN 13071-2:2008+A1:2013
95.99 Withdrawal of Standard
Nov 4, 2020

REVISED BY

PUBLISHED
SSH EN 13071-2:2019

Related project

Adopted from EN 13071-2:2008+A1:2013