DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

SSH EN 300 659-1 V1.3.1:2001

Aksesi dhe Terminalet (AT); Aksesi analog në Rrjetin e Komutuar të Telefonisë Publike (PSTN); Protokolli i linjave për shërbime me parapagim mbi treguesin lokal të cikleve (dhe të ngjashme); Pjesa 1: Transmetimi i të dhënave në lidhje trup me trup

Access and Terminals (AT); Analogue access to the Public Switched Telephone Network (PSTN); Subscriber line protocol over the local loop for display (and related) services; Part 1: On-hook data transmission
28 pri 2016

General information

60.60     28 pri 2016

DPS

DPS/KT 10

European Norm

33.040.40  

anglisht  

Buying

Publikuar

Language in which you want to receive the document.

Scope

The present document specifies the subscriber line protocol for the support of PSTN display services at Local Exchange
(LE) in "on-hook" state. The subscriber line protocol is accomplished by using asynchronous voice-band
Frequency-Shift Keying (FSK) signalling. The data transmission specified in the present document is provided only in
the direction from the LE to the TE.
In addition, annex B is provided in order to allow the continuation of use in those networks that already implemented a
Dual Tone Multi-Frequency (DTMF) based subscriber line protocol.
The requirements imposed on the FSK signalling-based subscriber line protocol deal with data encoding, data
transmission requirements and the three layers of the protocol at the network side of the interface:
• presentation layer;
• data link layer; and
• physical layer.
The requirements imposed on the DTMF-based subscriber line protocol deal with the transfer of the DTMF coded
display information. The procedures and the encoding arrangements are specified in annex B of the present document.
Terminal Equipment (TE) can be connected by analogue access directly to the LE or through an Access Network (AN).
In the latter case, data transmission can be applied from the LE or from elsewhere in the network hence a transmission
path needs to exist from the LE to the TE before data transmission. It is the network operator's responsibility to ensure
transmission path establishment. Transmission path establishment procedures are outside the scope of the present
document.

Life cycle

NOW

PUBLISHED
SSH EN 300 659-1 V1.3.1:2001
60.60 Standard published
28 pri 2016

Related project

Adopted from EN 300 659-1 V1.3.1:2001 IDENTICAL